Local Roadworks Starting This Week!

Local Roadworks This Week!
Don’t let roadworks hold you up!
Details of all roadworks happening in the next 7 days likely to cause delays locally impacting:
Hersham, Walton on Thames, Weybridge, Molesey, Esher, Cobham, Claygate, Surbiton, Chertsey, West Byfleet, Kingston, Thames Ditton, Leatherhead, Egham and others!
________________________________________
For flexible car repairs, car servicing and MOTs | Ask about our FREE Winter Check!
https://www.hershamservicestation.co.uk/
01932 229 022 | 01932 222 855 | service@hershamss.co.uk
Open: Mon to Thu 8 am – 6pm | Fri 8 am – 5.30 pm
________________________________________
A244 Claremont Lane, Esher, Surrey
16 March — 16 March
Delays likely – Lane closure
Works location: Claremont Lane – Approx 32m North of the junction with Milbourne Lane…
Works description: Minor Non-Excavation Works. Lane Closure to be isntalled using full chapter 8 signage and barriers….
Responsibility for works: Vodafone
Current status: Advanced planning
Works reference: NX21081722/STM/ERIC/GS1
________________________________________
A244 Copsem Lane, Esher, Surrey
16 March — 01 May
Delays likely – Traffic control (multi-way signals)
Works location: J/W Copsem Drive
Works description: Hard standing for police vehicle…
Responsibility for works: Surrey
Current status: Advanced planning
Works reference: MA400ITS19/695384-A
________________________________________
A245 Between Streets, Cobham, Surrey
16 March — 27 March
Delays likely – Traffic control (multi-way signals)
Works location: From Between Streets Bus Stop to junc of Loriners Close On Between Streets, KT11 1BE…
Works description: Moving and lowering 43m of ducting in footway and install box in footway…
Responsibility for works: VIRGIN MEDIA
Current status: Advanced planning
Works reference: NK100/SSEMDI/100332574
________________________________________
A245 Woodlands Lane, Stoke D’abernon, Cobham, Surrey
10 March — 11 March
Delays likely – Traffic control (two-way signals)
Works location: Woodlands Lane
Works description: Ditching
Responsibility for works: Surrey
Current status: Advanced planning
Works reference: MA01503741-ELM-WL-2
________________________________________
A307 High Street, Esher, Surrey
18 March — 18 March
Delays likely – Traffic control (multi-way signals)
Works location: 5
Works description: S81 EMERGENCY COVER REPLACEMEN–WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN…
Responsibility for works: THAMES WATER
Current status: Advanced planning
Works reference: MU026002252DSXQ–000006
________________________________________
A3,A307,A245 Portsmouth Road, Cobham, Surrey
12 March — 18 March
Delays likely – Road closure
Works location: North Field – Elvedon Road…
Works description: Pre Patching
Responsibility for works: Surrey
Current status: Advanced planning
Works reference: MA400PP/740250
________________________________________
B369 Walton Road, East Molesey, Surrey
17 March — 19 March
Delays likely – Traffic control (multi-way signals)
Works location: OUTSIDE 46 TO OUTSIDE 42…
Works description: LAY NEW DUCT IN FOOTWAY…
Responsibility for works: Openreach
Current status: Advanced planning
Works reference: BC005KL1W0000071017L2C/1
________________________________________
A245 Parvis Road, West Byfleet, Surrey
11 March — 24 March
Delays likely – Traffic control (two-way signals)
Works location: Csep 2 opp enterance to Hobbs Closem, Csep 1 120m East on PARVIS ROAD in footway & carriagway…
Works description: Excavate & connect to SGN Gas Main providing gas supply to new housing development. Approx dimension…
Responsibility for works: GAS TRANSPORTATION CO LTD
Current status: Advanced planning
Works reference: ZP00773204/EPLR
________________________________________
A307 Portsmouth Road, Kingston upon Thames, Kingston upon Thames
11 March — 11 March
Delays likely – Traffic control (multi-way signals)
Works location: Unknown
Works description: Gully Cleaning and Investigation works for Drainage.
Responsibility for works: Kingston upon Thames
Current status: Planned work about to start
Works reference: GH101LB0126000068924
________________________________________
A308 Staines Road West, Sunbury On Thames, Surrey
10 March — 10 March
Delays likely – Lane closure
Works location: Sunbury Cross to Scotts Avenue…
Works description: GROUNDS MAINTENANCE HIGHWAY VERGE CUTTING ON BEHALF OF SURREY HIGHWAYS…
Responsibility for works: Surrey
Current status: Advanced planning
Works reference: MA01503492-SPEL-SRW-2
________________________________________
A320 Guildford Road, Chertsey, Surrey
18 March — 20 March
Delays likely – Road closure
Works location: Chertsey Level Crossing…
Works description: lift and inspect crossing…
Responsibility for works: Network Rail
Current status: Advanced planning
Works reference: KL156VWW-22-20-180320
________________________________________
B387 Weir Road, Chertsey, Surrey
18 March — 18 March
Delays likely – Traffic control (multi-way signals)
Works location: Outside 18 Weir Road Chertsey KT16 8NF Surrey…
Works description: To provide safe working access for replacement of telephone pole…
Responsibility for works: Openreach
Current status: Advanced planning
Works reference: BC005OP1W0000IBBFFPEF01A
________________________________________
Ditton Hill, Surbiton, Surrey
16 March — 20 March
Delays likely – Traffic control (multi-way signals)
Works location: Opposite Cumbrae Gardens. f\w. c\w….
Works description: Connections Small Service:Installation of a new electricity supply for a customer:joint bay and 10 m…
Responsibility for works: UK POWER NETWORKS SOUTH EASTERN
Current status: Advanced planning
Works reference: KZ50020235427
________________________________________
French Street, Sunbury On Thames, Surrey
16 March — 30 May
Delays likely – Road closure
Works location: Entire road
Works description: Footway & highway improvements…
Responsibility for works: Surrey
Current status: Advanced planning
Works reference: MA400ITS648170-PAA
________________________________________
Lower Hampton Road, Sunbury On Thames, Surrey
11 March — 17 March
Delays likely – Traffic control (two-way signals)
Works location: O/S BIRKHOLME
Works description: HH Birkholm Plot 1, 1x32mm BP mtrd Suppl FOR NEW WATER SUPPLY IN FW ANDin Carriageway. Our intention…
Responsibility for works: THAMES WATER
Current status: Advanced planning
Works reference: MU307000808832720045-001
________________________________________
New Road, Shepperton, Surrey
16 March — 27 March
Delays likely – Traffic control (two-way signals)
Works location: from approx 300x metres on New Road to the junction with Watersplash Road and Squires Bridge Road…
Works description: Installation of 110mm Duct…
Responsibility for works: GEO
Current status: Advanced planning
Works reference: VK222SSHEPPERTONNORTH03A
________________________________________
A244 Gaston Bridge Road, Shepperton, Surrey
10 March — 06 April
Delays likely – Traffic control (two-way signals)
Works location: FROM O/S NO.155 TO C/O NO.1 UPPER HALLIFORD ROAD…
Works description: IMGA212297. ABANDON 210M X 4″ SI MAIN AND INSERT 75MM PE AND RELAY ORTRANSFER APPROX. 15 SERVICES…
Responsibility for works: Cadent
Current status: Advanced planning
Works reference: AZ0071000890171
________________________________________
A244 Upper Halliford Road, Shepperton, Surrey
10 March — 30 March
Delays likely – Traffic control (multi-way signals)
Works location: FROM O/S NO.1 TO O/S NO.19…
Works description: IMGA212297. ABANDON 77M X 4″ SI MAIN AND INSERT 75MM PE AND RELAY ORTRANSFER SERVICES…
Responsibility for works: Cadent
Current status: Advanced planning
Works reference: AZ0071000890172
________________________________________
A318 Byfleet Road, New Haw, Surrey
14 March — 14 March
Delays likely – Traffic control (two-way signals)
Works location: 136 BYFLEET ROAD NEW HAW KT15 3LE…
Works description: CONSEQUENTIAL DAMAGE – WORKING IN CARRIAGEWAY…
Responsibility for works: Affinity Water
Current status: Planned work about to start
Works reference: MX04410097442
________________________________________
B377 Ashford Road, Laleham, Surrey
10 March — 16 March
Delays likely – Traffic control (two-way signals)
Works location: OUTSIDE AND OPPOSITE 97-99 ASHFORD ROAD IN THE FOOTWAY AND CARRIAGEWAY…
Works description: LAY NEW DOMESTIC SERVICE 10M FROM MAIN IN FARSIDE FOOTWAY, ROAD CROSSINGTO FEED PROPERTIES…
Responsibility for works: Cadent
Current status: Advanced planning
Works reference: AZ0071000911680
________________________________________
First Avenue, West Molesey, Surrey
24 February – 22 March
Delays likely – Diversion route
Name: Diversion
Location: First Avenue
Description: Streetworks / License – Streetworks
Responsibility for event: Surrey
Current status: Planned
________________________________________
B374 Heath Road, Weybridge, Surrey
14 February — 30 July
Delays likely – Traffic control (multi-way signals)
Works location: Mitre Court
Works description: Footway widening and pedestrian island works on western side of Heath Road…
Responsibility for works: Surrey
Current status: Forward planning
Works reference: MA015SCC-HRLC
________________________________________
B375 Renfree Way, Shepperton, Surrey
10 February — 23 March
Delays likely – Traffic control (multi-way signals)
Works location: C/w at Junction of Renfree Way…
Works description: Permit for Traffic light head only. Permit in conjunction with Russell Road…
Responsibility for works: SGN
Current status: Advanced planning
Works reference: XW053W116420060-00752
________________________________________
French Street, Sunbury On Thames, Surrey
06 January — 31 March
Delays likely – Road closure
Works location: Entire road
Works description: Footway & highway improvements…
Responsibility for works: Surrey
Current status: Advanced planning
Works reference: MA400ITS648170-PAA
________________________________________
A245 Stoke Road, Cobham, Surrey
06 January — 31 March
Delays likely – Traffic control (two-way signals)
Works location: From No.11-41
Works description: Trial Holes
Responsibility for works: Surrey
Current status: Advanced planning
Works reference: MA400IT19C-695412-A
________________________________________
A245 Stoke Road, Stoke D’abernon, Cobham, Surrey
06 January — 31 March
Delays likely – Traffic control (two-way signals)
Works location: From No.41-57
Works description: Trial Holes
Responsibility for works: Surrey
Current status: Advanced planning
Works reference: MA400IT19C-695412-B
________________________________________
A245 Parvis Road, West Byfleet, Surrey
06 January — 20 March
Delays likely – Traffic control (two-way signals)
Works location: Outside Broadoaks Development…
Works description: SECTION50 WORKS LICENCE – Vividline Ltd – TW storm sewer diversion…
Responsibility for works: Surrey
Current status: Advanced planning
Works reference: MA050S50-1412WOK
________________________________________

Get your business in front of your ideal clients and customers.
Find out how here
https://thehershamhub.co.uk/work-with-the-hersham-hub/
________________________________________
Eriswell Road, Walton-on-thames, Surrey
16 March — 16 June
Delays possible – Traffic control (multi-way signals)
Works location: FROM THE JUNCTION BROADWATER ROAD NORTH TO THE JUNCTION WITH BURWOOD ROAD, CW / FW / VERGE…
Works description: GAS MAIN REPLACEMENT. TO LAY 1027M OF 125/250MM PE LP MAIN, RELAY 21 SERVICES, MAKE 15 CONNECTIONS A…
Responsibility for works: SGN
Current status: Advanced planning
Works reference: XW053W116745669-00493
________________________________________
Loriners Close, Cobham, Surrey
16 March — 27 March
Delays possible – Traffic control (multi-way signals)
Works location: Junction of Loriners Close and Between Streets on Loriners Close, KT11 1BE…
Works description: Moving and lowering 13m of ducting in carriageway and install box in footway…
Responsibility for works: VIRGIN MEDIA
Current status: Advanced planning
Works reference: NK100/SSEMDI/100332577
________________________________________
Mayfield Road, Hersham, Walton-on-thames, Surrey
18 March — 19 March
Delays possible – Traffic control (two-way signals)
Works location: Approx. 20m from the entrance Mayfield Road Car Park…
Works description: Excavation – Pole/Mast install for new telecommunication equipment….
Responsibility for works: T-Mobile (UK) Limited
Current status: Advanced planning
Works reference: YN11070625-PGN/ERF-6
________________________________________
Ockham Lane, Cobham, Surrey
17 March — 19 March
Delays possible – Traffic control (multi-way signals)
Works location: 12M EAST OF JUNC ESHER BRIDLEWAY 70/20 TO OPP JUNC ESHER BRIDLEWAY 70/20 ON , OCKHAM LANE…
Works description: Install 2m of 1 way poly duct in Carriageway, Build 1 chamber in 915mm x 445mm x 965mm deep in Verge…
Responsibility for works: Openreach
Current status: Advanced planning
Works reference: BC006TI001LC500293100500
________________________________________
Sandy Lane, Cobham, Surrey
11 March — 13 March
Delays possible – Traffic control (two-way signals)
Works location: O/S IDLEWOOD, SANDY LANE…
Works description: Access existing infrastructure, Install 6m of 1 way poly duct in Verge…
Responsibility for works: Openreach
Current status: Advanced planning
Works reference: BC006TI001LC500293250900
________________________________________
A243 Brighton Road, Surbiton, Kingston upon Thames
12 March — 16 March
Delays possible – Some carriageway incursion
Works location: Unknown
Works description: rectify defect
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC005PP25W00002083901014
________________________________________
B3363 Maple Road, Surbiton, Kingston upon Thames
11 March — 11 March
Delays possible – Some carriageway incursion
Works location: Unknown
Works description: Gully Cleaning and Investigation works for Drainage.
Responsibility for works: Kingston upon Thames
Current status: Planned work about to start
Works reference: GH101LB0126000068922
________________________________________
Cumbrae Gardens, Surbiton, Surrey
16 March — 20 March
Delays possible – Traffic control (multi-way signals)
Works location: LIGHT HEAD IN CUMBRAE GARDENS. c\w….
Works description: Connections Small Service:Traffic lights in secondary street for information only. Traffic lights fo…
Responsibility for works: UK POWER NETWORKS SOUTH EASTERN
Current status: Advanced planning
Works reference: KZ50020235429
________________________________________
Abbey Road, Chertsey, Surrey
18 March — 18 March
Delays possible – Traffic control (multi-way signals)
Works location: Outside 18 Weir Road Chertsey KT16 8NF Surrey…
Works description: To provide safe working access for replacement of damaged telephone pole…
Responsibility for works: Openreach
Current status: Advanced planning
Works reference: BC005OP1W0000IBBFFPEF01B
________________________________________
Sayes Court, Addlestone, Surrey
13 March — 16 March
Delays possible – Traffic control (Stop/Go boards)
Works location: liberty lane, rear of 49 Sayes Court…
Works description: new vco
Responsibility for works: Surrey
Current status: Advanced planning
Works reference: MA701ME-1443711
________________________________________
Steels Lane, Oxshott, Leatherhead, Surrey
11 March — 13 March
Delays possible – Traffic control (multi-way signals)
Works location: JCT OAKSHADE ROAD
Works description: SEWER CLEANING
Responsibility for works: THAMES WATER
Current status: Advanced planning
Works reference: MU026008109PQQX–001
________________________________________
Stonehill Road, Ottershaw, Surrey
12 March — 13 March
Delays possible – Traffic control (multi-way signals)
Works location: O/S ANCHOR HOUSE ON, STONEHILL ROAD…
Works description: Locate and excavate blockage(s) in existing duct, Access existing infrastructure…
Responsibility for works: Openreach
Current status: Advanced planning
Works reference: BC006TI001LC500293570701
________________________________________
Eriswell Road, Walton-on-thames, Surrey
24 February — 26 May
Delays possible – Traffic control (multi-way signals)
Works location: FROM THE JUNCTION BROADWATER ROAD NORTH TO THE JUNCTION WITH BURWOOD ROAD, CW / FW / VERGE…
Works description: GAS MAIN REPLACEMENT. TO LAY 1027M OF 125/250MM PE LP MAIN, RELAY 21 SERVICES, MAKE 15 CONNECTIONS A…
Responsibility for works: SGN
Current status: Advanced planning
Works reference: XW053W116745669-00493
________________________________________ `
First Avenue, West Molesey, Surrey
24 February — 27 April
Delays possible – Traffic control (multi-way signals)
Works location: FROM THE JUNCTION WITH WALTON ROAD TO OUTSIDE NUMBER 61 FIRST AVENUE, CW & FW…
Works description: GAS MAIN REPLACEMENT. TO LAY 260M OF 125MM PE LP MAIN, RELAY 35 SERVICES, MAKE 4 CONNECTIONS AND ABA…
Responsibility for works: SGN
Current status: Advanced planning
Works reference: XW053W116443332-00560
________________________________________
High Street, Thames Ditton, Surrey
06 February — 20 March
Delays possible – Traffic control (multi-way signals)
Works location: Outside 52 High Street to junction of St Leonards Road on Roundabout….
Works description: Open Cut 40m of 315mm PE main to abadon 40m of 9″ CI Main, 2 Services and dig out a syphen, reinstat…
Responsibility for works: SGN
Current status: Advanced planning
Works reference: XW053WW116454361-00699
________________________________________
The Crescent, Surbiton, Kingston upon Thames
10 February — 23 March
Delays possible – Traffic control (two-way signals)
Works location: Unknown
Works description: Lay 225mtrs 180mmPE. Abandon 225mtrs of 9″ CI. Complete all services. Make 1 mains connections. Complete all reinstatement.
Responsibility for works: SGN
Current status: Advanced planning
Works reference: XW053W116497359-00949
________________________________________
B376 High Street, Shepperton, Surrey
10 February — 23 March
Delays possible – Traffic control (multi-way signals)
Works location: C/w Junction of The High St…
Works description: Permit for traffic light head only. In conjunction with Russell Road permit….
Responsibility for works: SGN
Current status: Advanced planning
Works reference: XW053W116420072-00474
________________________________________
Church Road, Shepperton, Surrey
10 February — 23 March
Delays possible – Traffic control (multi-way signals)
Works location: C/w Junction of Church Road…
Works description: Permit for Traffic light head only. In conjuntion with Russell Road permit…
Responsibility for works: SGN
Current status: Advanced planning
Works reference: XW053W116420087-00204
________________________________________
High Street, Thames Ditton, Surrey
03 February — 16 March
Delays possible – Traffic control (multi-way signals)
Works location: Outside 52 High Street to junction of St Leonards Road on Roundabout….
Works description: Open Cut 40m of 315mm PE main to abadon 40m of 9″ CI Main, 2 Services and dig out a syphen, reinstat…
Responsibility for works: SGN
Current status: Advanced planning
Works reference: XW053WW116454361-00699
________________________________________
Heathfield, Cobham, Surrey
27 January — 20 April
Delays possible – Traffic control (multi-way signals)
Works location: From junction of Somerville Road to outside 13 Mole End…
Works description: Repalce 260m of water main @ 12m per day, 13 x transfers @ 1.5 per day, 3x final connections @ 3 day…
Responsibility for works: SUTTON & EAST SURREY WATER COMPANY
Current status: Advanced planning
Works reference: DZ001M0007124
________________________________________
First Avenue, West Molesey, Surrey
20 January — 19 March
Delays possible – Traffic control (multi-way signals)
Works location: FROM THE JUNCTION WITH WALTON ROAD TO OUTSIDE NUMBER 61 FIRST AVENUE, CW & FW…
Works description: GAS MAIN REPLACEMENT. TO LAY 260M OF 125MM PE LP MAIN, RELAY 35 SERVICES, MAKE 4 CONNECTIONS AND ABA…
Responsibility for works: SGN
Current status: Advanced planning
Works reference: XW053W116443332-00560
________________________________________

Back to The Hersham Hub Homepage
Have you joined The Hersham Hub group on Facebook?
www.facebook.com/groups/HershamHubCommunity/
________________________________________
Recent Posts:
Elmbridge Council Budget – £1m Shortfall
Coronavirus Confirmed In Surrey
________________________________________